WPE installs masts for wind measurement by order. Installation is done according to standards and bankable. WPE draws an installation report of the mast comprising 15-20 pages and contains all the necessary information so the wind measurements can be bankable.

During the campaign of measurements WPE provides OMS logistics – Operation and Maintenance Service, performs site visits and makes complete periodic wind reports at the end of the wind potential assessment campaign.

In order to install the masts, tilt-up systems are being used, without extra need of a crane or special utilities. The services assume “as build” contracts, where the beneficiary is only called at the equipment reception.

For more details please fill out the contact form.





Citeste si:

COMUNICATE DE PRESA

16/05/2012
STEAG acquires 108 MW Wind Farm Project in Romania from Monsson Group
Bucharest,  14 May 2012 Monsson Group, a Romanian private wind...
detalii...

24/04/2012
Wind Power Energy present at EWEA 2012 – Copengahen
Monsson Group was present at EWEA 2012 in Copenhagen this...
detalii...

» vezi toate comunicatele


STIRI WPE

STEAG cumpără proiectul eolian Crucea Nord de 108 MW
Monsson Group, dezvoltator privat de parcuri eoliene cu un portofoliu...
detalii...

Japonia anunta pierderi de 7,5 miliarde euro din cauza dezastrului de la Fukushima
Compania japoneza de electricitate Tokyo Electric Power (Tepco), pe cale...
detalii...

» vezi toate stirile


PROGNOZA METEO

Constanta


Home | Servicii de consultanta | Service si Mentenanta | Sonometrie | Prognoza meteo si de productie | Jobs | Contact