Microsite-ing and wind farm developing

Once the location of the investment is chosen, you can start the prefeasibility study, the feasibility study, the wind study, filling and obtaining the necessary permits and agreements.

In this period, an important part is the effective design of the park, by placing the turbines on the site. The wind turbines must be placed as good as possible in order to obtain a higher production of energy. Thus, respecting the standard distances or those from the legislation is not always a sufficient solution.

The experience of the WPE team, which has so far built over 2,000 MW of which 900 MW are already in the construction phase, will help you fully optimize the park, obtaining more energy and using other resources more efficiently.

For more details, please fill out the contact form.