Microsite-ing and wind farm developing

Once the location of the investment is chosen, you can start the prefeasibility study, the feasibility study, the wind study, filling and obtaining the necessary permits and agreements.

In this period, an important part is the effective design of the park, by placing the turbines on the site. The wind turbines must be placed as good as possible in order to obtain a higher production of energy. Thus, respecting the standard distances or those from the legislation is not always a sufficient solution.

The experience of the WPE team, which has so far built over 2,000 MW of which 900 MW are already in the construction phase, will help you fully optimize the park, obtaining more energy and using other resources more efficiently.

For more details, please fill out the contact form.





Citeste si:

COMUNICATE DE PRESA

16/05/2012
STEAG acquires 108 MW Wind Farm Project in Romania from Monsson Group
Bucharest,  14 May 2012 Monsson Group, a Romanian private wind...
detalii...

24/04/2012
Wind Power Energy present at EWEA 2012 – Copengahen
Monsson Group was present at EWEA 2012 in Copenhagen this...
detalii...

» vezi toate comunicatele


STIRI WPE

STEAG cumpără proiectul eolian Crucea Nord de 108 MW
Monsson Group, dezvoltator privat de parcuri eoliene cu un portofoliu...
detalii...

Japonia anunta pierderi de 7,5 miliarde euro din cauza dezastrului de la Fukushima
Compania japoneza de electricitate Tokyo Electric Power (Tepco), pe cale...
detalii...

» vezi toate stirile


PROGNOZA METEO

Constanta


Home | Servicii de consultanta | Service si Mentenanta | Sonometrie | Prognoza meteo si de productie | Jobs | Contact