In order to realize a complete and correct set of measurements on a long period of time (>1 year), WPE also accomplishes the operation and maintenance service for the sonometric network. After assembly and operation, the perfect functioning is essential for correct measurements.

Operating the sonometric measurements network has the following steps:

1.    Measurements sampling, distance sending and archiving in monthly and yearly documents;
2.    Data processing and monthly and yearly measurements forecasts emission;
3.    Periodical information reports drafting regarding the effective legislation;
4.    Elaboration of performance measurement reports;





Citeste si:

COMUNICATE DE PRESA

16/05/2012
STEAG acquires 108 MW Wind Farm Project in Romania from Monsson Group
Bucharest,  14 May 2012 Monsson Group, a Romanian private wind...
detalii...

24/04/2012
Wind Power Energy present at EWEA 2012 – Copengahen
Monsson Group was present at EWEA 2012 in Copenhagen this...
detalii...

» vezi toate comunicatele


STIRI WPE

STEAG cumpără proiectul eolian Crucea Nord de 108 MW
Monsson Group, dezvoltator privat de parcuri eoliene cu un portofoliu...
detalii...

Japonia anunta pierderi de 7,5 miliarde euro din cauza dezastrului de la Fukushima
Compania japoneza de electricitate Tokyo Electric Power (Tepco), pe cale...
detalii...

» vezi toate stirile


PROGNOZA METEO

Constanta


Home | Servicii de consultanta | Service si Mentenanta | Sonometrie | Prognoza meteo si de productie | Jobs | Contact